Search
 
Search by year
Search by keyword
Search by sector
Search by category
Find 
Sacmi RSS Feed
Find out how to subscribe to Sacmi RSS feeds
 
9/16/2009
Sacmi Imola successfully tests new ventilated facade plant

New facades to be produced in Germany by Creaton of Weroth

The plant supplied to Creaton at its Weroth plant has passed final testing with flying colours!

Creaton belongs to the ETEX group, the European holding company specializing in the building sector - especially roof tiles, flooring and ventilated facades – that employs a staggering 14,500 people.

The new Weroth plant was designed and developed to maximise automation and flexibility and provide an output rate of 900-1150 m2/day of tonality and tonality-plus ventilated walls from 150x300x22 and 35 kg/m2 to 600x2000x40 and 56 kg/m2

The plant consists of an extruder, guillotine, rapid 4-level roller dryer with a 45’ drying cycle, 2 glazing lines, a storage roller box and LGV, a single-layer roller kiln with a firing cycle lasting about 3 hours, an automatic cutting unit, strapping unit and palletizing robot.

The line operates on a 2-shift, 5-day basis; the kiln operates on a 3-shift, 7-day basis and the entire process is monitored by a supervisor unit.

This latest plant, then, underlines just how successful Sacmi’s large-size ventilated facade slab production technology – used by major producers worldwide - has now become.

Back

Business News

 
12/18/2017
Duravit Ceramics, third Riedhammer kiln supplied to Egyptian plant
New shuttle kiln, which joins existing sanitaryware firing/re-firing machines, successfully tested.  >>

12/11/2017
Leading Vietnamese PET firm purchases new Sacmi PVS-3 preform inspection machine
One of the country's leading container, PET preform and plastic cap manufacturers goes for the reliability offered by this latest Sacmi solution, which allows direct, on-line total quality control at high speeds.  >>

12/7/2017
North America and the Caribbean, the water market goes for Sacmi CCM
Major order from Puerto Rican firm PET Plastics, which has purchased a complete system capable of processing up to 2,000 caps per minute, with higher quality performance, lower costs and increased process efficiency.  >>

11/7/2017
Charu Ceramic Bangladesh gets output boost from Sacmi-Riedhammer
Great Wall Group company supplied with 2 new HWS shuttle kilns and a TWS tunnel kiln to ensure their success on the high-end ceramic sanitaryware market  >>

 

This website uses "cookies". If you choose to continue using the website, you are authorising the use of cookies according to our cookie policy. For further information or to deny the use of some cookies, please click here.

accept cookie policy