Search
 
Search by year
Search by keyword
Search by sector
Search by category
Find 
Sacmi RSS Feed
Find out how to subscribe to Sacmi RSS feeds
 
9/26/2011
Etex-Creaton, a pioneer of “fast drying”

First European plant of this type to be built in Poland with Sacmi-supplied technology

One of Europe’s biggest roof tile manufacturers, the Etex-Creaton group has begun building a plant in Poland for the production of 30 million roof tiles a year, trims and accessories included. This new plant’s entire drying department, which will be handling both tiles and trims, has been designed by Sacmi.

The plant’s strongpoint is on-roller fast drying technology, which now makes its first appearance in Europe after several successful installations on other continents. Completely automated, this Sacmi-supplied plant features, in fact, two 6-channel roller driers, each of which is 79 metres long. During drying - completed in the record time of 220 minutes - the roof tiles are supported by special metallic frames that contain nine pieces.

Also being supplied by Sacmi is the trim/accessory piece drying plant, which uses the more traditional static drying room method. Nevertheless, robots are an integral part of this second section of the plant too, thus ensuring a high degree of automation and minimising the need for manual piece handling.

Back

Business News

 
1/4/2018
Sacmi supplies Catalan Ceramics with the largest press in Vietnam
A South-East Asian player that is already the leader on the local market recently purchased a complete glazed ceramic tile plant from Sacmi.  >>

1/3/2018
Preform inspection systems, leading Spanish company goes for the guarantees provided by Sacmi PVS
After the PVS-2, installed and started up to the customer's enormous satisfaction, the company has now purchased the new Sacmi PVS-3 system, designed for high speed checking of preform lots.  >>

12/20/2017
A breath of fresh air at Ge.Fe. Polymers thanks to Sacmi
Thanks to the “electronic nose” lent to Arpae Imola free of charge, objective readings of the unpleasant smells emitted by the plastic recycling plant have now been taken  >>

12/18/2017
Duravit Ceramics, third Riedhammer kiln supplied to Egyptian plant
New shuttle kiln, which joins existing sanitaryware firing/re-firing machines, successfully tested.  >>

 

This website uses "cookies". If you choose to continue using the website, you are authorising the use of cookies according to our cookie policy. For further information or to deny the use of some cookies, please click here.

accept cookie policy