Search
 
Search by year
Search by keyword
Search by sector
Search by category
Find 
Sacmi RSS Feed
Find out how to subscribe to Sacmi RSS feeds
 
5/10/2002
LE PIOPPE ceramic plant

New double-firing plant

The LE PIOPPE ceramic plant of Castellarano, part of the Group which also comprises the S. VALENTINO, NUOVE IDEE, APICE and LABOCER ceramic companies, recently commissioned SACMI to supply a new plant for the production of first fire “biscuit” material, to be sold to companies which will then glaze it. This plant - wholly SACMI-built from the presses onwards – is made up of 2 PH 1500 presses, 1 EVA 712 drier (suitable for small tiles), a maxicompenser link with the kiln and a 70-metre FMS 2070. The outgoing product is packed in strap-sealed boxes automatically. This high performance plant will produce 4000 m²/day, continuously. The product range will include 10x10x8.5 cm and 13x13x9 cm tiles using a 44 minute firing cycle. This new technology will allow LE PIOPPE to replace an existing plant with a tunnel kiln and reduce production costs significantly without altering quality.
Back

Business News

 
6/21/2018
Robotized gel-coating, Gaiotto completes major project with leading waterpark supplier
Turkish firm Polin Waterparks has turned to Sacmi for the robotized gel-coating of its water slide moulds. This one-of-a-kind project ensures maximum automation and impressive colour variety.  >>

6/21/2018
Pressure casting is the new gold standard for the global sanitaryare industry
So said Abdallah Massaad, CEO of the Rak Group, in a recent interview with Asian Ceramics. The interview took place against a backdrop of recent Group investment in Sacmi casting and robotized glazing technology.  >>

6/4/2018
Argentine company Refres Now goes for Sacmi OPERA roll-fed technology
Recent orders have seen the number of labellers installed at the model La Matanza plant - one of the largest and most modern in Latin America - rise to 8.  >>

6/4/2018
Ceramica Ilca (Globo Group) chooses Made in Sacmi total automation
Sacmi supplies a robotized piece handling and feed system for the piece finishing centre and downstream internal glazing station, to be installed on two existing Sacmi glazing lines.  >>

 

This website uses "cookies". If you choose to continue using the website, you are authorising the use of cookies according to our cookie policy. For further information or to deny the use of some cookies, please click here.

accept cookie policy